1
High availability / Change Backup to Master
« on: February 20, 2024, 11:28:24 am »
Hi,
after some problems we decide to switch of the master node.
Now we want to reuse it, but we did some chnages on rules etc. on the backup node while the master node was out.
How could I manage the situation?
Could I provide the backup node to master, after that I setup the old master to backup?
Or wat is the right way?
Thank You!
Gregor
after some problems we decide to switch of the master node.
Now we want to reuse it, but we did some chnages on rules etc. on the backup node while the master node was out.
How could I manage the situation?
Could I provide the backup node to master, after that I setup the old master to backup?
Or wat is the right way?
Thank You!
Gregor

